Easy and Trusted Asphalt

Call Us Today: 1240.226.2848

Snow Removal- Alternatives for the asphalt surface in Fort Mohave, Arizona


Snow Removal installed on an unstable surface can quickly lead to problems. There are three Chief choices for the basic installation:

  1. Paving Over Existing Driveway: If your current driveway is in good shape and not revealing serious fractures or crumbling, hot asphalt mixture can be laid directly over your driveway. 1 facet is elevation: make certain fences, garage floors, and other structures are not jeopardized by the greater degree of the new surface.
  2. Remove old driveway, peg to the ground: The existing driveway is totally eliminated (or you may not have a driveway nonetheless ) and 4 to 6 inches of warm paving stone is placed directly on the ground.
  3. Remove the old driveway and fasten it into a good surface. This is actually the preferred method. An aggregated stone floor partially replaces part of this hot asphalt mix.

The longer asphalt you work, the more leeway you might have. By way of example, in 40 F, the crews only have 16 minutes to operate on 1 1/2 inch thick asphalt. As the asphalt depth increases by 3 inches, the workability time also raises: 46 minutes. In general, for thin asphalt programs (about 1.5 cm), you should wait until temperatures are 21 ° C or higher. Between 50 and 60 F, then you'll need to consult with your contractor. The hot mix is ​​still functional in this period, but the time is limited.

How much does an Snow Removal price in Fort Mohave?

Take into account the weather vagaries of our climate when deciding upon the standard of asphalt. The significant temperature variations that we experience cause appreciable damage to asphalt perform.

Furthermore, it'll be useful to distinguish the contractor if you have a recreational vehicle or a van. He might have to accommodate the asphalt mix so as to be more immune to the weight of heavy vehicles.

The Benefits of Snow Removal

A driveway paved with asphalt has several benefits:

It will cost you between $ 3 and $11 per square foot; the cost varies depending on the characteristic of the asphalt used and the paving contractor.

To get a sustainable Snow Removal

The existence of an asphalt paver may be up to 20 decades, when the best states are met. We're talking about a professional paving builder, a good quality of asphalt as well as an optimal asphalt laying technique.


The longevity of residential asphalt paving chiefly depends upon the standard of the laying. Really, the significant causes of deformation or ripping of an asphalt coating are the absence of compaction plus a thin foundation. On the other hand, the maintenance of the asphalt pavement can be a deciding factor in its own longevity. That's to say, you'll need to seal your drive once in ten years, at a minimum, so as to maintain its great condition.


We suggest that you notify your asphalting contractor if you decide to get your driveway asphalt so as to offer your property. It might not be essential to pay top dollar for placing asphalt , in such a case.

Snow Removal placing: cost and contract

The option of the asphalt laying builder is indispensable. In order to not have unpleasant surprises, then you will have to select it carefully.

Our guarantees and Snow Removal work

Make sure the paving contractor has liability insurance. A trip to the web site of the Office for Consumer Protection (OPC) will make it possible for you to verify whether an entrepreneur has ever been the subject of complaints.

The following details must be included in the contract:

- date of start and finish of the work;

- proof of insurance;

- technical details;

- RBQ certification number.

You ought to be aware that a paving builder cannot require that you make a deposit before work has started. However, you should agree on the payment provisions and make sure it's about the contract.

A solid foundation for Snow Removal- Fort Mohave

Prior to estimating the asphalt drive to your new home by a contractor, or acquiring some fundamental knowledge is vital to make sure the job is well done. Know first that the absence of compaction and the inadequate thickness of the base are the two chief causes of the deformation or tearing of a layer of asphalt. When it's a new driveway, then it must initially be excavated to make room for a coating of crushed stone of sufficient thickness. A geotextile membrane is going to be set beneath the granular backfill if the dirt turns out to be somewhat loamy (clayey). If you have a new home, it's best to wait for 6 to 12 months prior to paving your driveway, to enable the dirt to settle . In the event of a repair of the entrance, a simple replacement of the asphalt coating can be considered if the contractor believes that the present foundation is sufficient. In both scenarios, base redone or foundation maintained, the duration of its guarantee has to be the same.

Snow Removal Fort Mohave Arizona

The weather conditions in our beautiful province may have a disastrous impact on an asphalt drive, hence the significance of adding a slope having a minimum slope of 2%. This will allow water to drain into the street and minimize the risk of heaving or cracking. This important detail has to be taken into account when excavating and preserved during backfilling.

If you've got a van or recreational vehicle, notify the builder before the onset of the work: he will be able to supply materials accordingly. Some asphalt mixtures produce an asphalt which is more immune to heavy-duty vehicles.

The asphalt coating should have an initial thickness of 6.35 to 7.6 cm (2.5 to 3 ) so as to reach a thickness of at least 5 cm (2 in) after being compacted. For optimum stability, the base should extend across the surface to be paved by roughly thirty centimeters (a couple inches) on each side. Also note that the installation of unwanted supports around the base is a fantastic way to prevent potential cracks and this asphalting done in chilly weather is going to be of poor quality. It is therefore better to wait for the bright days to return before beginning work.

A Snow Removal contract with your builder in Fort Mohave

To avoid unpleasant surprises, choose your contractor diligently and be certain the title and address of the company are composed on the contract. The start and finish dates of the work, as well as proof of the contractor's liability insurance and the technical specifics of this job to be completed, should also be included. No contractor should need a deposit before work begins. To prevent the inconvenience that might cause unforeseen costs, take a look at the Snow RemovalFort Mohave website. You may thus have the resources in hand to successfully finish your asphalt paving project.

Snow Removal Fort Mohave - Greatest Arizona in Arizona!

For quality asphalting work , call on Snow Removal, Fort Mohave specialist team. Confirm our Business department to figure out the regions served.

Concrete Maintenance Fort Mohave | Tar And Chip Paving Fort Mohave
Home >> arizona/fort mohave >> snow removal
Share this...