Easy and Trusted Asphalt

Call Us Today: 1240.226.2848

Snow Removal- Alternatives for the asphalt surface in Glendale, Arizona


Snow Removal installed in an unstable surface could quickly lead to difficulties. There are 3 main choices for the basic setup:

  1. Paving Over Existing Driveway: If your current driveway is in good shape and not revealing severe fractures or crumbling, hot asphalt mixture can be placed directly within your driveway. One aspect is height: make sure fences, garage floors, and other constructions aren't jeopardized by the higher degree of this surface.
  2. Eliminate old driveway, peg to the ground: The present driveway is completely removed (or you may not have a driveway yet) and 4 to 6 inches of hot paving stone is put directly on the ground.
  3. Eliminate the old driveway and fasten it to a good surface. This is the preferred method. An aggregated stone floor partially replaces part of the hot asphalt mix. Typically 6 to 8 inches of aggregate extends under 3 inches of asphalt.

Our Services:

The best time to install Snow Removal in Glendale

The more asphalt you work, the more leeway you have. For instance, in 40 F, the crews just have 16 minutes to work on 1 1/2 inch thick asphalt. As the asphalt depth increases by 3 inches, the workability time also raises: 46 minutes. In general, for lean asphalt applications (about 1.5 cm), you should wait until temperatures are 21 ° C or even higher. Between 50 and 60 F, then you ought to consult with your contractor. The hot mix is ​​still functional in this period, but the time is limited.

How much does an Snow Removal cost in Glendale?

Consider the weather vagaries of the climate when choosing the standard of asphalt. The significant temperature variations we experience cause appreciable damage to asphalt perform.

In addition, it'll be useful to distinguish the contractor should you have a recreational vehicle or even a van. He will have to accommodate the asphalt mix in order to be more immune to the weight of heavy vehicles.

The advantages of Snow Removal

  • Smooth end;
  • non-slip
  • Simple to maintain
  • watertightness guaranteed
  • withstands the rigors of this Quebec climate quite well (provided it's been installed );
  • prevents the growth of moss;

It'll cost you between $ 3 and $11 per square foot; the cost fluctuates based on the characteristic of the asphalt used and the paving contractor.

For a sustainable Snow Removal

The life of an asphalt paver can be up to 20 decades, when the best states are satisfied. We're referring to a professional paving builder, a good grade of asphalt as well as an optimal asphalt laying technique.


The longevity of residential asphalt paving largely is dependent upon the quality of the placing. Indeed, the significant causes of deformation or ripping of an asphalt layer are the absence of compaction plus a lean base. On the other hand, the upkeep of the asphalt pavement can be a determining factor in its longevity. That's to say, you will need to seal your drive once in 10 decades, at a minimum, in order to keep its great state.


We suggest that you inform your asphalting contractor in case you decide to get your driveway asphalt in order to sell your property. It might not be essential to pay top dollar for placing asphalt , in such a case.

Snow Removal laying: cost and contract

The option of the asphalt laying builder is essential. In order to not have unpleasant surprises, then you will need to choose it carefully.

Make sure the paving contractor has liability insurance. A trip to the website of the Office for Consumer Protection (OPC) will make it possible for you to confirm whether an entrepreneur has become the subject of complaints.

The following details should be included in the arrangement:

- date of beginning and finish of the work;

- evidence of insurance;

- technical particulars;

- RBQ certification number.

You should know that a paving contractor can't demand you to make a deposit before work has begun. However, you need to agree to the payment terms and make sure it is on the contract.

Before redoing the asphalt driveway to your new home by a builder, or obtaining some fundamental knowledge is vital to make sure the job is done. Know first that the absence of compaction and the inadequate thickness of the base are the two chief causes of the deformation or tearing of a layer of asphalt. If it's a new driveway, then it must initially be excavated to make room for a coating of crushed stone of adequate depth. A geotextile membrane will be placed beneath the granular backfill if the dirt turns out to be very loamy (clayey). If you have a new home, it's ideal to wait for 6 to 12 months prior to paving your driveway, to allow the soil to settle naturally. In the event of a fix of the entry, a simple replacement of the asphalt coating can be considered in the event the contractor considers that the present base is sufficient. In both cases, base redone or foundation preserved, the duration of its guarantee has to be exactly the same.

Snow Removal Glendale Arizona

The weather conditions in our beautiful province may have a disastrous impact on an asphalt drive, hence the significance of adding a slope having a minimum slope of 2%. This will enable water to drain into the road and minimize the risk of heaving or cracking. This important detail has to be taken into account when excavating and preserved during backfilling.

In case you have a van or recreational vehicle, notify the contractor before the onset of the job: he is going to have the ability to supply materials so. Some asphalt combinations produce an asphalt which is more immune to heavy-duty vehicles.

The asphalt coating should have an initial thickness of 6.35 to 7.6 cm (2.5 to 3 ) so as to accomplish a thickness of 5 cm (2 in) after being compacted. For optimal stability, the foundation should extend over the surface to be paved by about thirty centimeters (a dozen inches) on each side. Also note that the setup of side supports around the base is a fantastic method to avoid potential cracks and this asphalting done in chilly weather will be of poor quality. It's therefore better to await the sunny days to go back before starting work.

To avoid unpleasant surprises, select your contractor diligently and be sure the name and address of his business are composed on the contract. The start and end dates of the job, in addition to proof of the contractor's liability insurance and also the technical specifics of the project to be completed, should also be included. No contractor should need a down payment before work starts. To prevent the inconvenience that might cause unforeseen costs, visit the Snow RemovalGlendale website. You may thus have all the resources in hand to successfully complete your asphalt paving project.

Snow Removal Glendale - Greatest Arizona at Arizona!

For quality asphalting perform , phone on Snow Removal, Glendale professional team. We have over twenty decades of experience in asphalt laying, resurfacing, maintenance and repair. Confirm our Company section to figure out the regions served.

Concrete Maintenance Glendale | Tar And Chip Paving Glendale
Home >> arizona/glendale >> snow removal
Share this...