Easy and Trusted Asphalt

Call Us Today: 1240.226.2848

Asphalt- Options for the asphalt Coating in Goodyear, Arizona


Asphalt installed in an unstable surface can quickly lead to difficulties. There are 3 main options for the basic setup:

  1. Paving Over Existing Driveway: If your existing driveway is in good shape and not revealing serious fractures or crumbling, hot asphalt mixture can be laid directly over your driveway. One aspect is height: make sure fences, garage floors, and other constructions aren't compromised by the higher degree of this surface.
  2. Remove old driveway, peg to the floor: The existing driveway is completely removed (or you may not have a driveway yet) and 4 to 6 inches of hot paving stone is put directly on the ground.
  3. Remove the old driveway and fasten it into a good surface. This is actually the preferred method. An aggregated stone flooring partly replaces part of the hot asphalt mix. Typically 6 to 8 inches of limestone goes under 3 inches of asphalt.

The more asphalt you work, the more leeway you might have. For instance, in 40 F, the crews only have 16 minutes to operate on 1 1/2 inch thick asphalt. As the asphalt depth increases by 3 inches, the workability time also increases: 46 minutes. Generally, for thin asphalt programs (about 1.5 cm), you need to wait until temperatures are 21 ° C or even higher. Between 50 and 60 F, then you'll need to speak to your contractor. The hot mix is ​​still functional during this period, but the time is limited.

How much does an Asphalt cost in Goodyear?

Consider the weather vagaries of the climate when deciding upon the standard of asphalt. The significant temperature variations that we experience cause considerable damage to asphalt work.

In addition, it'll be useful to distinguish the contractor should you own a recreational vehicle or even a van. He might have to accommodate the asphalt mixture in order to be more immune to the burden of heavy vehicles.

The advantages of Asphalt

  • Smooth finish;
  • non invasive
  • Simple to Keep
  • watertightness ensured
  • withstands the rigors of the Quebec climate quite well (provided it has been installed optimally);
  • prevents the growth of moss;

It will cost you between $ 3 and $11 per square foot; the cost varies depending on the characteristic of the asphalt used along with the paving contractor.

For a sustainable Asphalt

The life of an asphalt paver can be up to 20 years, when the very best conditions are satisfied. We're talking about a professional paving builder, a good grade of asphalt and an optimal asphalt laying technique.


The longevity of residential asphalt paving largely is dependent upon the quality of the laying. Really, the major causes of deformation or ripping of an asphalt layer are the lack of compaction and a thin foundation. However, the maintenance of the asphalt pavement can be a determining factor in its longevity. That is to say, you will have to seal your drive once in ten years, at a minimum, so as to maintain its good condition.


We suggest that you notify your asphalting contractor if you decide to have your driveway asphalt so as to sell your property. It may not be necessary to pay top dollar for laying asphalt , in this circumstance.

Asphalt laying: cost and contract

The option of the asphalt laying contractor is essential. In order not to have unpleasant surprises, then you will have to choose it carefully.

Make sure the paving contractor has liability insurance. A trip to the web site of the Office for Consumer Protection (OPC) will allow you to confirm whether an entrepreneur has been the subject of complaints.

The following details must be included in the arrangement:

- date of beginning and end of the job;

- evidence of insurance;

- technical particulars;

- RBQ certification number.

You ought to be aware that a paving builder cannot demand that you make a deposit before work has begun. However, you should agree to the payment terms and make sure it's on the contract.

Prior to estimating the asphalt driveway to your new residence by a builder, or obtaining some basic knowledge is imperative to guarantee that the job is well done. Know first that the absence of compaction and the insufficient depth of the base are the two chief sources for the deformation or tearing of a layer of asphalt. If it is a new driveway, then it has to first be excavated to make room for a coating of crushed stone of adequate depth. A geotextile membrane will be placed beneath the granular backfill if the dirt turns out to be somewhat loamy (clayey). If you have a new house, it's ideal to wait 6 to 12 months before paving your driveway, to allow the soil to settle . In the case of a repair of the entry, a simple replacement of the asphalt coating can be considered in the event the contractor considers that the present foundation is sufficient. In both cases, foundation redone or foundation maintained, the duration of its warranty must be exactly the same.

Asphalt Goodyear Arizona

The weather conditions in our beautiful province can have a disastrous impact on an asphalt drive, thus the significance of including a slope with a minimum slope of 2%. This will allow water to drain to the road and minimize the risk of heaving or cracking. This important detail has to be taken into account when excavating and maintained during backfilling.

If you've got a van or recreational vehicle, notify the builder prior to the onset of the job: he is going to be able to provide materials accordingly. Some asphalt combinations produce an asphalt that is more immune to heavy duty vehicles.

The asphalt coating should have a first thickness of 6.35 to 7.6 cm (2.5 to 3 in) in order to accomplish a thickness of at least 5 cm (2 in) after being compacted. For optimum stability, the base should extend across the surface to be paved by roughly thirty centimeters (a couple inches) on each side. Also note that the installation of unwanted supports around the foundation is a good way to avoid possible cracks and this asphalting done in cold weather will be of inferior quality. It's therefore better to await the bright days to go back before beginning work.

A definite contract with your builder in Goodyear

To avoid unpleasant surprises, then select your contractor and be sure that the title and address of the business are composed about the contract. The beginning and finish dates of this job, in addition to proof of this contractor's liability insurance and the technical details of the project to be completed, should also be included. No contractor should require a deposit before work starts. To avoid the inconvenience that might cause unforeseen expenses, take a look at the AsphaltGoodyear site. You may thus have all the tools in hand to successfully complete your asphalt paving project.

Asphalt Goodyear - Best Arizona in Arizona!

For quality asphalting work , call on Asphalt, Goodyear professional team. Consult our Company department to find out the regions served.

Tar And Chip Paving Goodyear | Parking Lot Repair And Striping Goodyear
Home >> arizona/goodyear >> asphalt
Share this...