Easy and Trusted Asphalt

Call Us Today: 1240.226.2848

Concrete Maintenance- Options for the asphalt surface in Ellicott City, Maryland


Concrete Maintenance installed on an unstable surface can quickly lead to problems. There are 3 Chief options for the basic installation:

  1. Paving Over Existing Driveway: If your current driveway is in good shape rather than revealing severe cracks or crumbling, hot asphalt mixture can be laid directly over your driveway. 1 facet is height: make certain fences, garage floors, and other constructions are not jeopardized by the greater level of this surface.
  2. Eliminate old driveway, counter into the ground: The present driveway is completely removed (or you might not have a driveway yet) and 4 to 6 inches of hot paving stone is put right on the ground.
  3. Remove the old driveway and secure it into a solid surface. This is actually the preferred method. An aggregated stone flooring partly replaces part of the hot asphalt mixture. Generally 6 to 8 inches of aggregate extends under 3 inches of asphalt.

The more asphalt you work, the more leeway you might have. By way of instance, in 40 F, the crews only have 16 minutes to work on 1 1/2 inch thick asphalt. As the asphalt thickness increases by 3 inches, the workability time also increases: 46 minutes. Generally, for lean asphalt applications (approximately 1.5 cm), you should wait until temperatures are 21 ° C or higher. Between 50 and 60 F, you ought to consult with your contractor. The hot mix remains functional during this period of time, but the time is limited.

How much does an Concrete Maintenance price in Ellicott City?

Consider the weather vagaries of the climate when deciding upon the standard of asphalt. The substantial temperature variations that we experience cause considerable damage to asphalt work.

Furthermore, it will be useful to distinguish the contractor should you have a recreational vehicle or a van. He might have to adapt the asphalt mix so as to be more immune to the burden of heavy vehicles.

The advantages of Concrete Maintenance

  • Smooth finish;
  • non invasive
  • Simple to maintain
  • watertightness ensured
  • withstands the rigors of this Quebec climate quite well (provided it has been set up optimally);
  • prevents the growth of moss;

It will cost you between $ 3 and $11 per square foot; the price varies depending on the quality of the asphalt used and the paving contractor.

To get a sustainable Concrete Maintenance

The existence of an asphalt paver may be up to 20 decades, when the very best states are met. We are talking about a professional paving contractor, a great grade of asphalt as well as an optimal asphalt laying technique.

Concrete Maintenance in Ellicott City: price, quality of work and lifespan


The longevity of residential asphalt paving chiefly is dependent upon the quality of the placing. Indeed, the significant causes of deformation or tearing of an asphalt layer are the absence of compaction plus a lean base. On the other hand, the maintenance of the asphalt sidewalk is also a determining factor in its own longevity. That is to say, you'll have to seal your drive once in 10 decades, at a minimum, in order to maintain its good state.


We suggest that you notify your asphalting contractor in case you decide to get your driveway asphalt in order to sell your property. It may not be necessary to pay top dollar for placing asphalt , in such a case.

Concrete Maintenance laying: price and contract

The option of the asphalt laying builder is essential. In order not to have unpleasant surprises, you will need to select it carefully.

Make sure the paving contractor has liability insurance. A visit to the web site of the Office for Consumer Protection (OPC) will allow you to verify whether an entrepreneur has ever been the subject of complaints.

The following details must be included in the arrangement:

- date of beginning and end of the work;

- proof of insurance;

- technical details;

- RBQ certification number.

You should be aware that a Concrete Maintenance builder cannot require that you make a down payment before work has started. However, you need to agree on the payment terms and make sure it's about the contract.

A solid foundation for Concrete Maintenance- Ellicott City

Before redoing the Concrete Maintenance drive to your new residence by a builder, or obtaining some basic knowledge is vital to guarantee that the job is done. Know first that the absence of compaction and the inadequate thickness of the base are the two main causes of the deformation or tearing of a coating of asphalt. When it's a new driveway, then it must initially be excavated to make room for a layer of crushed stone of adequate depth. A geotextile membrane is going to be set under the granular backfill if the soil turns out to be very loamy (clayey). If you own a new home, it is best to wait for 6 to 12 months before paving your driveway, to enable the soil to settle . In the event of a fix of this entrance, a simple replacement of the Concrete Maintenance coating can be considered if the contractor considers that the existing foundation is adequate. In both scenarios, base redone or foundation maintained, the whole period of its warranty must be the same.

Concrete Maintenance Ellicott City Maryland

The weather conditions in our lovely state may have a devastating effect on an asphalt driveway, thus the importance of including a slope with a minimum slope of 2%. This will enable water to drain to the road and minimize the danger of heaving or cracking. This important detail must be taken into account when excavating and maintained during backfilling.

If you have a van or recreational vehicle, notify the contractor before the onset of the job: he will be able to supply materials so. Some asphalt mixtures produce an asphalt that is more immune to heavy duty vehicles.

The asphalt coating should have an initial thickness of 6.35 to 7.6 cm (2.5 to 3 ) so as to reach a thickness of 5 cm (2 in) after being compacted. For optimum stability, the foundation should extend across the surface to be paved by about thirty centimeters (a couple inches) on each side. Also mention that the installation of side supports around the foundation is a fantastic method to avoid possible cracks and this Concrete Maintenance done in cold weather will be of poor quality. It is therefore far better to await the sunny days to go back before starting work.

A definite contract with your contractor in Ellicott City

To avoid unpleasant surprises, choose your contractor and be sure the name and address of the company are composed on the contract. The beginning and finish dates of this work, in addition to proof of this builder's liability insurance and also the technical specifics of this job to be completed, should also be included. No contractor should need a down payment before work starts. To avoid the inconvenience that could cause unforeseen expenses, visit the Concrete MaintenanceEllicott City site. You will thus have the tools in hand to successfully complete your Concrete Maintenance project.

Concrete Maintenance Ellicott City - Greatest Maryland at Maryland!

For quality asphalting perform , phone on Concrete Maintenance, Ellicott City specialist team. Confirm our Business department to figure out the regions served.

Parking Lot Repair And Striping Ellicott City | Snow Removal Ellicott City
Home >> maryland/ellicott city >> concrete maintenance
Share this...