Concrete Maintenance- Options for the asphalt surface in Hagerstown, Maryland


Concrete Maintenance installed in an unstable surface can quickly lead to problems. There are 3 Chief choices for the basic setup:

  1. Paving Over Existing Driveway: If your existing driveway is in good shape rather than revealing severe fractures or crumbling, hot asphalt mixture can be laid directly over your driveway. 1 aspect is elevation: make certain fences, garage floors, and other constructions are not compromised by the higher level of this surface.
  2. Eliminate old driveway, counter into the floor: The present driveway is completely removed (or you might not have a driveway yet) and 4 to 6 inches of hot paving stone is put directly on the ground.
  3. Eliminate the old driveway and fasten it into a solid surface. This is the preferred method. An aggregated stone flooring partly replaces part of the hot asphalt mixture. Typically 6 to 8 inches of limestone extends under 3 inches of asphalt.

Our Services:

The best time to install Concrete Maintenance in Hagerstown

The longer asphalt you operate, the more leeway you might have. For instance, in 40 F, the crews only have 16 minutes to operate on 1 1/2 inch thick asphalt. As the asphalt thickness increases by 3 inches, the workability time also increases: 46 minutes. In general, for lean asphalt applications (approximately 1.5 cm), you need to wait until temperatures are 21 ° C or higher. Between 50 and 60 F, then you ought to speak to your contractor. The hot mix remains functional in this period, however, the time is limited.

How much can an Concrete Maintenance price in Hagerstown?

Consider the weather vagaries of our climate when deciding upon the standard of asphalt. The significant temperature variations that we experience cause considerable damage to asphalt perform.

In addition, it will be good to tell the contractor if you own a recreational vehicle or a van. He might have to accommodate the asphalt mixture in order to be more resistant to the weight of heavy vehicles.

The advantages of Concrete Maintenance

  • Smooth end;
  • non invasive
  • easy to maintain
  • watertightness ensured
  • withstands the rigors of the Quebec climate very well (provided it's been installed );
  • prevents the growth of moss;

It'll cost you between $ 3 and $11 per square foot; the price fluctuates based on the characteristic of the asphalt employed along with the paving contractor.

For a sustainable Concrete Maintenance

The life of an asphalt paver can be up to 20 decades, when the best states are satisfied. We're talking about a professional paving builder, a good grade of asphalt and an optimal asphalt laying technique.

Concrete Maintenance in Hagerstown: price, quality of work and lifespan


The durability of residential asphalt paving chiefly depends on the standard of the placing. Really, the major causes of deformation or tearing of an asphalt coating are the lack of compaction and a lean base. On the other hand, the upkeep of the asphalt pavement is also a deciding factor in its longevity. That is to say, you will have to seal your driveway once in 10 decades, at a minimum, so as to maintain its good state.


We suggest that you notify your asphalting contractor if you decide to have your driveway asphalt in order to offer your property. It might not be essential to pay top dollar for placing asphalt , in this circumstance.

Concrete Maintenance laying: price and contract

The option of the asphalt laying contractor is indispensable. In order not to have unpleasant surprises, then you'll need to choose it carefully.

Guarantee that the paving contractor has liability insurance coverage. A trip to the website of the Office for Consumer Protection (OPC) will make it possible for you to verify whether an entrepreneur has become the subject of complaints.

The following details should be included in the contract:

- date of start and end of the work;

- proof of insurance;

- technical details;

- RBQ accreditation number.

You ought to know that a Concrete Maintenance contractor cannot require that you make a down payment before work has begun. But you should agree to the payment provisions and be sure it is about the contract.

Prior to estimating the Concrete Maintenance driveway to your new residence by a contractor, or acquiring some basic knowledge is imperative to make sure the job is well done. Know first that the absence of compaction and the insufficient thickness of the base are the two chief sources for the deformation or ripping of a layer of asphalt. When it's a new driveway, it has to first be excavated to make room for a coating of crushed stone of sufficient thickness. A geotextile membrane will be set under the granular backfill if the dirt turns out to be somewhat loamy (clayey). If you have a new home, it's best to wait 6 to 12 months prior to paving your drive, to allow the dirt to settle . In the event of a repair of the entrance, an easy replacement of the Concrete Maintenance coating can be considered if the contractor believes that the existing foundation is sufficient. In both cases, foundation redone or foundation preserved, the whole period of its warranty must be the same.

Concrete Maintenance Hagerstown Maryland

The weather conditions in our lovely state can have a devastating effect on an asphalt driveway, hence the significance of adding a slope with a minimum slope of 2%. This will allow water to drain into the road and minimize the risk of heaving or cracking. This significant detail has to be taken into consideration when excavating and maintained during backfilling.

In case you have a van or recreational vehicle, notify the contractor before the onset of the work: he is going to have the ability to supply materials accordingly. Some asphalt mixtures produce an asphalt that is more immune to heavy-duty vehicles.

The asphalt coating should have an initial thickness of 6.35 to 7.6 cm (2.5 to 3 in) so as to accomplish a thickness of 5 cm (2 in) after being compacted. For optimum stability, the base should extend over the surface to be paved by about thirty centimeters (a dozen inches) on each side. Also note that the installation of side supports around the foundation is a fantastic method to avoid potential cracks and this Concrete Maintenance done in cold weather will be of inferior quality. It is therefore better to wait for the bright days to go back before starting work.

A definite contract with your contractor in Hagerstown

To avoid unpleasant surprises, choose your contractor and make sure that the title and address of the business are written about the contract. The start and end dates of the work, as well as evidence of the contractor's liability insurance and the technical details of the project to be completed, should also be included. No contractor should need a down payment before work starts. To avoid the inconvenience that could cause unforeseen expenses, take a look at the Concrete MaintenanceHagerstown site. You may thus have all the resources in hand to successfully complete your Concrete Maintenance project.

Concrete Maintenance Hagerstown - Best Maryland at Maryland!

For quality asphalting perform , call on Concrete Maintenance, Hagerstown specialist team. We've got more than twenty decades of experience in asphalt laying, resurfacing, maintenance and repair. Confirm our Business department to figure out the regions served.

Parking Lot Repair And Striping Hagerstown | Snow Removal Hagerstown
Home >> maryland/hagerstown >> concrete maintenance
Share this...