Easy and Trusted Asphalt

Call Us Today: 1240.226.2848

Concrete Maintenance- Alternatives for the asphalt Coating in Joppatowne, Maryland


Concrete Maintenance installed on an unstable surface can quickly lead to difficulties. There are three main options for the Simple installation:

  1. Paving Over Existing Driveway: If your existing driveway is in good shape and not revealing severe fractures or crumbling, hot asphalt mixture can be placed directly within your driveway. One facet is elevation: make certain fences, garage floors, and other structures aren't jeopardized by the higher level of the surface.
  2. Remove old driveway, counter into the ground: The present driveway is totally removed (or you may not have a driveway yet) and 4 to 6 inches of warm paving stone is put right on the ground.
  3. Remove the old driveway and secure it to a solid surface. This is the preferred method. An aggregated stone floor partly replaces part of the hot asphalt mix. Typically 6 to 8 inches of limestone goes under 3 inches of asphalt.

Our Services:

The best time to install Concrete Maintenance from Joppatowne

The longer asphalt you work, the more leeway you have. By way of instance, at 40 F, the crews only have 16 minutes to operate on 1 1/2 inch thick asphalt. In general, for thin asphalt programs (about 1.5 cm), you need to wait until temperatures are 21 ° C or higher. Between 50 and 60 F, then you ought to consult with your contractor. The hot mix is ​​still functional in this period of time, however, the time is constrained.

How much does an Concrete Maintenance price in Joppatowne?

Take into account the weather vagaries of the climate when deciding upon the standard of asphalt. The substantial temperature variations we experience cause appreciable damage to asphalt work.

Furthermore, it'll be good to tell the contractor should you have a recreational vehicle or a van. He might have to adapt the asphalt mixture so as to be more resistant to the burden of heavy vehicles.

The Benefits of Concrete Maintenance

A driveway paved with asphalt has several advantages:

It'll cost you between $ 3 and $11 per square foot; the price fluctuates based on the characteristic of the asphalt employed along with the paving contractor.

For a sustainable Concrete Maintenance

The existence of an asphalt paver can be up to 20 decades, when the very best states are met. We're talking about a professional paving contractor, a good quality of asphalt as well as an optimal asphalt laying technique.

Concrete Maintenance in Joppatowne: cost, quality of work and lifespan


The longevity of residential asphalt paving chiefly is dependent on the standard of the placing. Really, the major causes of deformation or ripping of an asphalt coating are the absence of compaction and a lean base. On the other hand, the maintenance of the asphalt pavement is also a deciding factor in its own longevity. That is to say, you will need to seal your drive once in ten years, at a minimum, so as to keep its great state.


We advise you to notify your asphalting contractor in case you decide to have your driveway asphalt so as to sell your property. It may not be necessary to pay top dollar for placing asphalt , in such a circumstance.

Concrete Maintenance laying: price and contract

The choice of the asphalt laying builder is essential. In order to not have unpleasant surprises, then you'll have to choose it carefully.

Guarantee that the paving contractor has liability insurance coverage. A trip to the website of the Office for Consumer Protection (OPC) will allow you to verify whether an entrepreneur has become the subject of complaints.

The following details must be included in the contract:

- date of beginning and finish of the work;

- evidence of insurance;

- technical details;

- RBQ certification number.

You should be aware that a Concrete Maintenance builder cannot demand you to make a deposit before work has begun. But you need to agree on the payment terms and be sure it is about the contract.

Prior to estimating the Concrete Maintenance drive to your new residence by a contractor, or acquiring some basic knowledge is vital to make sure the job is well done. Know first that the lack of compaction and the inadequate thickness of the foundation are the two chief causes of the deformation or tearing of a coating of asphalt. When it is a new driveway, it must initially be excavated to make room for a coating of crushed stone of adequate thickness. A geotextile membrane will be set under the granular backfill if the soil proves to be somewhat loamy (clayey). If you have a new house, it's ideal to wait for 6 to 12 months before paving your driveway, to allow the soil to settle . In the case of a fix of this entry, a simple replacement of the Concrete Maintenance coating can be considered if the contractor believes that the existing base is sufficient. In both scenarios, base redone or foundation preserved, the whole period of its guarantee must be exactly the same.

Concrete Maintenance Joppatowne Maryland

The weather conditions in our lovely state may have a disastrous impact in an asphalt driveway, hence the significance of including a slope with a minimum slope of 2%. This will enable water to drain into the street and decrease the risk of heaving or cracking. This significant detail has to be taken into account when excavating and maintained during backfilling.

In case you have a van or recreational vehicle, notify the builder before the onset of the job: he is going to be able to provide materials so. Some asphalt mixtures produce an asphalt that is more resistant to heavy-duty vehicles.

The asphalt coating should have an initial thickness of 6.35 to 7.6 cm (2.5 to 3 in) in order to reach a thickness of 5 cm (2 ) after being compacted. For optimal stability, the foundation should extend across the surface to be paved by about thirty centimeters (a dozen inches) on each side. Also note that the installation of unwanted supports around the base is a fantastic method to avoid possible cracks and this Concrete Maintenance done in cold weather is going to be of inferior quality. It's therefore far better to await the sunny days to go back before starting work.

To avoid unpleasant surprises, then select your contractor diligently and be certain the title and address of his company are written about the contract. The beginning and end dates of the work, as well as proof of this builder's liability insurance and also the technical details of this project to be carried out, should also be included. No contractor should need a down payment before work starts. To prevent the inconvenience that could lead to unforeseen costs, visit the Concrete MaintenanceJoppatowne website. You will thus have the resources in hand to successfully complete your Concrete Maintenance project.

Concrete Maintenance Joppatowne - Greatest Maryland at Maryland!

For quality asphalting work , phone on Concrete Maintenance, Joppatowne specialist team. We've got more than twenty years of experience in asphalt laying, resurfacing, maintenance and repair. Confirm our Company department to find out the regions served.

Parking Lot Repair And Striping Joppatowne | Snow Removal Joppatowne
Home >> maryland/joppatowne >> concrete maintenance
Share this...