Easy and Trusted Asphalt

Call Us Today: 1240.226.2848

Concrete Maintenance- Alternatives for the asphalt Coating in Rosedale, Maryland


Concrete Maintenance installed in an unstable surface can quickly lead to problems. There are three main choices for the Simple setup:

  1. Paving Over Existing Driveway: If your existing driveway is in good shape and not revealing serious cracks or crumbling, hot asphalt mixture can be laid directly over your driveway. 1 facet is elevation: make certain fences, garage flooring, and other constructions are not jeopardized by the greater level of the surface.
  2. Eliminate old driveway, peg to the floor: The present driveway is totally removed (or you might not have a driveway yet) and 4 to 6 inches of hot paving stone is put right on the ground.
  3. Remove the old driveway and secure it to a good surface. This is the preferred method. An aggregated stone floor partly replaces part of this hot asphalt mix.

The more asphalt you operate, the more leeway you might have. By way of instance, in 40 F, the crews only have 16 minutes to operate on 1 1/2 inch thick asphalt. As the asphalt thickness increases by 3 inches, the workability time also increases: 46 minutes. Generally, for thin asphalt applications (approximately 1.5 cm), you need to wait until temperatures are 21 ° C or higher. Between 50 and 60 F, you ought to speak to your contractor. The hot mix is ​​still functional in this period of time, however, the time is limited.

How much does an Concrete Maintenance cost in Rosedale?

Consider the weather vagaries of the climate when deciding upon the standard of asphalt. The substantial temperature variations we experience cause considerable damage to asphalt work.

In addition, it'll be good to distinguish the contractor if you own a recreational vehicle or a van. He might need to adapt the asphalt mixture so as to be more resistant to the weight of heavy vehicles.

The Benefits of Concrete Maintenance

A driveway paved with asphalt has several benefits:

It'll cost you between $ 3 and $11 per square foot; the cost fluctuates based on the characteristic of the asphalt employed and the paving contractor.

To get a sustainable Concrete Maintenance

The life of an asphalt paver can be up to 20 years, when the best states are satisfied. We're talking about a professional paving contractor, a good grade of asphalt and an optimal asphalt laying technique.


The longevity of residential asphalt paving largely is dependent on the standard of the laying. Really, the major causes of deformation or tearing of an asphalt coating are the lack of compaction plus a lean base. However, the maintenance of the asphalt sidewalk can be a deciding factor in its own longevity. That is to say, you will have to seal your driveway once in 10 decades, at a minimum, so as to keep its great condition.


We advise you to inform your asphalting contractor if you decide to get your driveway asphalt so as to sell your property. It might not be necessary to pay top dollar for laying asphalt , in such a case.

Concrete Maintenance placing: price and contract

The option of the asphalt laying builder is indispensable. In order to not have unpleasant surprises, you'll have to select it carefully.

Make sure the paving contractor has liability insurance. A trip to the website of the Office for Consumer Protection (OPC) will allow you to confirm whether an entrepreneur has been the subject of complaints.

The following details must be included in the contract:

- date of start and finish of the job;

- evidence of insurance;

- technical particulars;

- RBQ certification number.

You ought to know that a Concrete Maintenance contractor can't require that you make a deposit before work has begun. But you should agree to the payment provisions and be sure it is on the contract.

A strong base for Concrete Maintenance- Rosedale

Before redoing the Concrete Maintenance drive to your new residence by a contractor, or obtaining some basic knowledge is imperative to guarantee that the job is well done. Know first that the lack of compaction and the insufficient depth of the base are the two main sources for the deformation or ripping of a layer of asphalt. If it's a new driveway, it must initially be excavated to make room for a layer of crushed stone of sufficient thickness. A geotextile membrane is going to be set under the granular backfill if the dirt turns out to be somewhat loamy (clayey). If you have a new house, it is best to wait 6 to 12 months prior to paving your driveway, to allow the dirt to settle naturally. In the event of a repair of this entrance, a simple replacement of the Concrete Maintenance coating can be considered in the event the contractor believes that the existing foundation is sufficient. In both cases, base redone or foundation maintained, the duration of its warranty has to be exactly the same.

Concrete Maintenance Rosedale Maryland

The weather conditions in our beautiful province can have a devastating effect on an asphalt drive, hence the significance of including a slope with a minimum slope of 2%. This will allow water to drain into the road and minimize the risk of heaving or cracking. This important detail must be taken into account when excavating and preserved during backfilling.

If you've got a van or recreational vehicle, notify the contractor before the start of the job: he will be able to supply materials accordingly. Some asphalt combinations produce an asphalt which is more resistant to heavy-duty vehicles.

The asphalt layer should have an initial thickness of 6.35 to 7.6 cm (2.5 to 3 in) so as to accomplish a thickness of at least 5 cm (2 in) after being compacted. For optimal stability, the base should extend across the surface to be paved by about thirty centimeters (a dozen inches) on each side. Also note that the setup of unwanted supports around the foundation is a good method to prevent possible cracks and this Concrete Maintenance done in chilly weather is going to be of poor quality. It's therefore better to await the sunny days to return before beginning work.

A Concrete Maintenance contract with your contractor in Rosedale

To avoid unpleasant surprises, select your contractor and make certain that the title and address of his company are composed about the contract. The start and end dates of the job, in addition to evidence of this builder's liability insurance and also the technical details of the project to be completed, should also be included. No contractor should require a deposit before work starts. To avoid the inconvenience that could cause unforeseen costs, take a look at the Concrete MaintenanceRosedale website. You may thus have all the resources in hand to successfully finish your Concrete Maintenance project.

Concrete Maintenance Rosedale - Greatest Maryland at Maryland!

For quality asphalting perform , call on Concrete Maintenance, Rosedale professional team. We've got over twenty years of expertise in asphalt laying, resurfacing, maintenance and repair. Confirm our Company section to find out the regions served.