Easy and Trusted Asphalt

Call Us Today: 1240.226.2848

Concrete Maintenance- Options for the asphalt Coating in Suitland, Maryland


Concrete Maintenance installed on an unstable surface can quickly lead to problems. There are three main options for the Simple setup:

  1. Paving Over Existing Driveway: If your current driveway is in good shape and not revealing severe fractures or crumbling, hot asphalt mix can be laid directly over your driveway. 1 facet is elevation: make sure fences, garage flooring, and other structures aren't jeopardized by the greater level of this new surface.
  2. Remove old driveway, counter into the floor: The existing driveway is totally eliminated (or you may not have a driveway nonetheless ) and 4 to 6 inches of hot paving stone is placed directly on the ground.
  3. Eliminate the old driveway and secure it into a solid surface. This is the preferred method. An aggregated stone floor partly replaces part of this hot asphalt mixture.

Our Services:

The best time to install Concrete Maintenance from Suitland

The more asphalt you work, the more leeway you might have. By way of instance, at 40 F, the crews just have 16 minutes to operate on 1 1/2 inch thick asphalt. In general, for thin asphalt applications (about 1.5 cm), you should wait until temperatures are 21 ° C or higher. Between 50 and 60 F, then you ought to consult with your contractor. The hot mix is ​​still practical in this period, however, the time is limited.

How much does an Concrete Maintenance cost in Suitland?

Take into account the weather vagaries of our climate when choosing the quality of asphalt. The significant temperature variations we experience cause appreciable damage to asphalt work.

Furthermore, it will be useful to distinguish the contractor if you own a recreational vehicle or even a van. He will need to accommodate the asphalt mix so as to be more resistant to the weight of heavy vehicles.

The Benefits of Concrete Maintenance

A driveway paved with asphalt has several benefits:

It'll cost you between $ 3 and $11 per square foot; the price varies depending on the quality of the asphalt employed along with the paving contractor.

To get a sustainable Concrete Maintenance

The life of an asphalt paver can be up to 20 decades, when the best conditions are met. We are talking about a professional paving contractor, a good quality of asphalt and also an optimal asphalt laying technique.

Concrete Maintenance in Suitland: cost, quality of work and lifespan


The longevity of residential asphalt paving largely is dependent on the quality of the laying. Really, the significant causes of deformation or ripping of an asphalt coating are the lack of compaction and a lean base. However, the upkeep of the asphalt pavement can be a deciding factor in its longevity. That is to say, you'll have to seal your drive once in ten decades, at a minimum, so as to maintain its good condition.


We advise you to inform your asphalting builder if you decide to have your driveway asphalt so as to offer your property. It may not be essential to pay top dollar for placing asphalt , in such a circumstance.

Concrete Maintenance placing: price and contract

The option of the asphalt laying contractor is essential. In order to not have unpleasant surprises, you'll have to select it carefully.

Our ensures and Concrete Maintenance work

Make sure the paving contractor has liability insurance. A visit to the web site of the Office for Consumer Protection (OPC) will allow you to verify whether an entrepreneur has ever been the subject of complaints.

The following details must be included in the arrangement:

- date of beginning and end of the work;

- proof of insurance;

- technical particulars;

- RBQ certification number.

You should be aware that a Concrete Maintenance builder can't require that you make a deposit before work has started. However, you should agree on the payment terms and be sure it's on the contract.

Before redoing the Concrete Maintenance driveway to your new residence by a contractor, or obtaining some fundamental knowledge is vital to make sure the job is done. Know first that the absence of compaction and the insufficient thickness of the base are the two chief sources for the deformation or ripping of a coating of asphalt. When it is a new driveway, then it must initially be excavated to make room for a layer of crushed stone of sufficient thickness. A geotextile membrane is going to be set under the granular backfill if the soil proves to be very loamy (clayey). If you have a new house, it is best to wait for 6 to 12 months before paving your driveway, to enable the soil to settle naturally. In the case of a repair of this entrance, an easy replacement of the Concrete Maintenance layer can be considered in the event the contractor believes that the existing base is sufficient. In both scenarios, base redone or foundation preserved, the whole period of its guarantee has to be the same.

Concrete Maintenance Suitland Maryland

The weather conditions in our lovely state may have a devastating effect on an asphalt driveway, thus the importance of adding a slope having a minimum slope of 2%. This will enable water to drain into the street and minimize the risk of heaving or cracking. This significant detail must be taken into consideration when excavating and preserved during backfilling.

In case you've got a van or recreational vehicle, notify the builder prior to the onset of the job: he will have the ability to supply materials accordingly. Some asphalt mixtures produce an asphalt which is more immune to heavy-duty vehicles.

The asphalt coating should have an initial thickness of 6.35 to 7.6 cm (2.5 to 3 in) so as to reach a thickness of at least 5 cm (2 ) after being compacted. For optimal stability, the foundation should extend over the surface to be paved by roughly thirty centimeters (a dozen inches) on each side. Also mention that the setup of side supports around the base is a fantastic method to avoid possible cracks and this Concrete Maintenance done in chilly weather is going to be of inferior quality. It is therefore far better to await the sunny days to go back before beginning work.

To avoid unpleasant surprises, choose your contractor and be certain that the title and address of the company are written on the contract. The beginning and finish dates of this job, in addition to proof of this builder's liability insurance and also the technical specifics of the job to be carried out, should also be included. No contractor should require a deposit before work begins. To prevent the inconvenience that could lead to unforeseen expenses, visit the Concrete MaintenanceSuitland site. You will thus have all the resources in hand to successfully finish your Concrete Maintenance project.

Concrete Maintenance Suitland - Greatest Maryland in Maryland!

For quality asphalting work , phone on Concrete Maintenance, Suitland professional team. Consult our Business section to find out the regions served.

Parking Lot Repair And Striping Suitland | Snow Removal Suitland
Home >> maryland/suitland >> concrete maintenance
Share this...