Easy and Trusted Asphalt

Call Us Today: 1240.226.2848

Concrete Maintenance- Options for the asphalt Coating in White Oak, Maryland


Concrete Maintenance installed in an unstable surface could quickly lead to problems. There are 3 Chief choices for the basic installation:

  1. Paving Over Existing Driveway: If your existing driveway is in good condition rather than showing severe fractures or crumbling, hot asphalt mixture can be laid directly over your driveway. One aspect is elevation: make sure fences, garage flooring, and other constructions aren't compromised by the greater level of the new surface.
  2. Eliminate old driveway, counter into the ground: The existing driveway is totally eliminated (or you may not have a driveway yet) and 4 to 6 inches of hot paving stone is put right on the ground.
  3. Remove the old driveway and fasten it into a good surface. This is the preferred method. An aggregated stone flooring partly replaces part of this hot asphalt mixture. Generally 6 to 8 inches of aggregate extends under 3 inches of asphalt.

The longer asphalt you work, the more leeway you have. For instance, in 40 F, the crews only have 16 minutes to operate on 1 1/2 inch thick asphalt. As the asphalt depth increases by 3 inches, the workability time also increases: 46 minutes. Generally, for thin asphalt programs (approximately 1.5 cm), you should wait until temperatures are 21 ° C or higher. Between 50 and 60 F, you'll need to consult with your contractor. The hot mix is ​​still functional in this period of time, however, the time is constrained.

How much can an Concrete Maintenance cost in White Oak?

Consider the weather vagaries of the climate when choosing the quality of asphalt. The significant temperature variations we experience cause considerable damage to asphalt work.

Furthermore, it will be good to distinguish the contractor should you own a recreational vehicle or a van. He will need to accommodate the asphalt mix in order to be more resistant to the weight of heavy vehicles.

The Benefits of Concrete Maintenance

A driveway paved with asphalt has several benefits:

It'll cost you between $ 3 and $11 per square foot; the cost fluctuates based on the quality of the asphalt employed along with the paving contractor.

To get a sustainable Concrete Maintenance

The life of an asphalt paver may be up to 20 decades, when the very best states are satisfied. We are referring to a professional paving builder, a great grade of asphalt as well as also an optimal asphalt laying technique.


The longevity of residential asphalt paving largely depends on the quality of the placing. Indeed, the significant causes of deformation or ripping of an asphalt layer are the absence of compaction plus a thin foundation. On the other hand, the upkeep of the asphalt sidewalk can be a determining factor in its own longevity. That's to say, you'll have to seal your drive once in 10 decades, at a minimum, so as to maintain its good condition.


We suggest that you notify your asphalting builder if you choose to get your driveway asphalt in order to sell your property. It may not be essential to pay top dollar for laying asphalt , in this circumstance.

Concrete Maintenance laying: cost and contract

The choice of the asphalt laying contractor is indispensable. In order to not have unpleasant surprises, you will have to select it carefully.

Make sure the paving contractor has liability insurance. A visit to the web site of the Office for Consumer Protection (OPC) will make it possible for you to verify whether an entrepreneur has ever become the subject of complaints.

The following details should be included in the contract:

- date of beginning and end of the job;

- evidence of insurance;

- technical details;

- RBQ certification number.

You should be aware that a Concrete Maintenance builder cannot demand that you make a deposit before work has started. However, you need to agree to the payment provisions and be sure it is about the contract.

Before redoing the Concrete Maintenance driveway to your new residence by a contractor, or acquiring some basic knowledge is vital to make sure the job is well done. Know first that the lack of compaction and the insufficient depth of the base are the two main causes of the deformation or ripping of a coating of asphalt. When it's a new driveway, then it has to first be excavated to make room for a coating of crushed stone of adequate depth. A geotextile membrane is going to be set under the granular backfill if the soil turns out to be very loamy (clayey). If you own a new house, it is best to wait 6 to 12 months prior to paving your drive, to enable the dirt to settle . In the event of a fix of the entrance, a simple replacement of the Concrete Maintenance layer can be considered if the contractor considers that the present base is adequate. In both cases, foundation redone or base preserved, the duration of its warranty must be exactly the same.

Concrete Maintenance White Oak Maryland

The weather conditions in our beautiful province may have a disastrous impact in an asphalt drive, hence the importance of including a slope with a minimum slope of 2%. This will enable water to drain to the street and minimize the danger of heaving or cracking. This important detail must be taken into consideration when excavating and preserved during backfilling.

If you've got a van or recreational vehicle, notify the builder before the onset of the job: he is going to have the ability to provide materials so. Some asphalt mixtures produce an asphalt that is more resistant to heavy duty vehicles.

The asphalt layer should have a first thickness of 6.35 to 7.6 cm (2.5 to 3 ) in order to reach a thickness of 5 cm (2 ) after being compacted. For optimum stability, the foundation should extend over the surface to be paved by roughly thirty centimeters (a dozen inches) on each side. Also note that the setup of side supports around the base is a good method to prevent potential cracks and this Concrete Maintenance done in cold weather is going to be of inferior quality. It's therefore better to wait for the sunny days to go back before starting work.

A definite contract with your builder in White Oak

To avoid unpleasant surprises, then choose your contractor and be sure the name and address of the company are composed on the contract. The beginning and finish dates of this work, as well as evidence of this contractor's liability insurance and the technical details of the project to be carried out, should also be included. No contractor should require a deposit before work begins. To avoid the inconvenience that might cause unforeseen expenses, take a look at the Concrete MaintenanceWhite Oak website. You may thus have the resources in hand to successfully complete your Concrete Maintenance project.

Concrete Maintenance White Oak - Best Maryland at Maryland!

For caliber asphalting work , call on Concrete Maintenance, White Oak professional team. Confirm our Business section to figure out the regions served.

Parking Lot Repair And Striping White Oak | Snow Removal White Oak